The college anticipates the building design to be completed by fall with construction to wrap by summer 2016.
The college anticipates the building design to be completed by fall with construction to wrap by summer 2016.
The college anticipates the building design to be completed by fall with construction to wrap by summer 2016.
The college anticipates the building design to be completed by fall with construction to wrap by summer 2016.
Look back at some of UMSL Daily’s top stories from the past year, including the launch of the UMSL School of Engineering and the naming of the Ed G. Smith College of Business, along with continuing campus transformation.