The new school will begin enrolling students in the fall of 2025, operating alongside the existing joint engineering program and catering to more traditional, full-time students with classes on the UMSL campus.

The new school will begin enrolling students in the fall of 2025, operating alongside the existing joint engineering program and catering to more traditional, full-time students with classes on the UMSL campus.
The new school will begin enrolling students in the fall of 2025, operating alongside the existing joint engineering program and catering to more traditional, full-time students with classes on the UMSL campus.
The new school will begin enrolling students in the fall of 2025, operating alongside the existing joint engineering program and catering to more traditional, full-time students with classes on the UMSL campus.
Jones previously served as president of both the Missouri Optometric Student Association and the Fellowship of Christian Optometrists and has been heavily involved in the college.