The new school will begin enrolling students in the fall of 2025, operating alongside the existing joint engineering program and catering to more traditional, full-time students with classes on the UMSL campus.

The new school will begin enrolling students in the fall of 2025, operating alongside the existing joint engineering program and catering to more traditional, full-time students with classes on the UMSL campus.
The new school will begin enrolling students in the fall of 2025, operating alongside the existing joint engineering program and catering to more traditional, full-time students with classes on the UMSL campus.
The new school will begin enrolling students in the fall of 2025, operating alongside the existing joint engineering program and catering to more traditional, full-time students with classes on the UMSL campus.
The District 7 competition featured students from 12 local high schools competing in 37 different categories for a spot in the state event.