The college anticipates the building design to be completed by fall with construction to wrap by summer 2016.

The college anticipates the building design to be completed by fall with construction to wrap by summer 2016.
The college anticipates the building design to be completed by fall with construction to wrap by summer 2016.
The college anticipates the building design to be completed by fall with construction to wrap by summer 2016.
The District 7 competition featured students from 12 local high schools competing in 37 different categories for a spot in the state event.