Here’s a look at the UMSL Recreation and Wellness Center construction progress. The facility is slated to open in the fall of 2015.
The photograph was taken by UMSL photographer August Jennewein and is the latest to be featured in Eye on UMSL.
Here’s a look at the UMSL Recreation and Wellness Center construction progress. The facility is slated to open in the fall of 2015.
The photograph was taken by UMSL photographer August Jennewein and is the latest to be featured in Eye on UMSL.
LATEST NEWS
A group of 35 students in the Accelerated BSN program and 10 students in the DNP program completed their degrees in August.
A group of 35 students in the Accelerated BSN program and 10 students in the DNP program completed their degrees in August.
A group of 35 students in the Accelerated BSN program and 10 students in the DNP program completed their degrees in August.
Students gained hands-on experience with orthopedic surgical techniques while exploring careers in medicine and engineering through the immersive summer workshop.
Work on the expansion of the Social Sciences and Business Building in the UMSL Quad on North Campus has progressed steadily over the summer.
The biochemistry and biotechnology major was part of the inaugural cohort of students from The Bahamas who made their way to UMSL through a partnership with the Ministry of Education.
The biochemistry and biotechnology major was part of the inaugural cohort of students from The Bahamas who made their way to UMSL through a partnership with the Ministry of Education.
The biochemistry and biotechnology major was part of the inaugural cohort of students from The Bahamas who made their way to UMSL through a partnership with the Ministry of Education.